google advertising
Shipping options Free via Economy shipping (1 to 10 business days) to United States
Payment options
Paypal,Bank Transfer,Cash on Delivery
Return policy


TECHNICAL FEATURES OF PREFABRICATED BUILDINGS

TECHNICAL DATA
EARTHQUAKE CONDITIONS (1st degree earthquake zone) effective ground acceleration coefficient: A0=0,4
CLIMATE CONDITIONS Production is made based on 3rd climate zone
SNOW LOAD VALUE 75 Kg/m2
WIND SPEED VALUE 80 km/h (Must be fixed to the ground)
EXTERIOR WALL INSULATION COEFFICIENT K: 0.45 Kcal/m²hC ( K: 0,53 W/m² K )
INTERNAL WALL INSULATION COEFFICIENT K: 0.44 Kcal/m²hC ( K: 0,51 W/m² K )
LIGHT STEEL MATERIAL Erdemir 1311 ,(ST-37 ) Standard DIN EN 10147-00, zinc plated galvanized steel structure is used.
CEMENT BOARD Density: ~ 1300 kg / m³ flame retardant (B1 to DIN 4102 Part 1)Thermal conductivity coefficient (λ10 ˚ C dry)
EPS (Expanded Polystyrene Foam) TS EN 13163
CHASSIS LOAD CAPACITY 200 kg/m² (for two-storey buildings) (Calculated according toT.S 498 e.)
ROOF INSULATION COEFFICIENT K: 0.39 Kcal/m²hC ( K: 0,43 W/m² K )
INTERIOR AND EXTERIOR PANELS
The outer and inner panels are manufactured of 8X1250X2500 mm two-sided cement board. 84mm 12 density polystyrene rigid foam in used between cement baords for insulation. Outer panel thickness is 10 cm and inner panels are 6 cm an the panel height is 250 cm. The heaviest wall panel among the full panel, window panel, door panel, transom panel from which prefabricated houses are made (125x250 cm exterior door panel) is 114 kg.
PANEL JOINTS
As joining elements special U and H galvanized steel profiles are used that are bent and combined by means of special connection system. Rust will not occur as a result of sweating because of the curved edges.
CARRIER CONSTRUCTIONS
Roof trusses, beams and columns are made of special shaped galvanized steel profiles. Along the building every 1250 mm a special shaped steel truss is placed and on top of truss a special shaped galvanized steel purlin is mounted. Bolts and nuts are used in assembly so that building can be reassembled many times. Production is being done in our modern production facilities with seamless and bold connection system.
MEZZANINE CONSTRUCTION
The mezzanine construction carrier frame is made of special shaped galvanized steel profiles. The mezzanine floor is covered with 16mm cement board (cement-bonded particle board). On the ground floor suspended ceiling an 80 mm thickness (14 kg/m³) layer of glass wool is placed for sound and heat insulation. The mezzanine load is 200 kg/m²
ROOF
ROOF SYSTEM Sloping value for gable roof and pitched roof systems is 30%
ROOF COVERING AND INSULATION Over the metal purlin, painted trapezoidal steel sheets are placed as roof covering.Optionanally tile pattern painted trapezoidal sheets can be applied. Gable end covering is PVC paneling. Overhangs are 20 cm.Wide galvanized steel sheet shaped fringes with vents are used. For the roof special shaped galvanized steel sheet in diagonal shape are being used. PVC made square shape rain gutters and cylindrical downspouts with mounted accessories are used. Rain gutters and its accessories can be made of steel sheet upon request.
CEILING
For ceiling covering 12 mm gypsum boards are used. For ceiling insulation above the suspended ceiling gypsum board, 80 mm glass wool is laid. Below the combining roof chassis, omega profiles that are made of galvanized steel are fastened. Rust will not occur as reasult of sweating that occurs on steel sheet edges because of curved shape. PVC cover is used on ceiling Omega profiles to give them aesthetical look. Gypsum boards joining elements are made of electrostatic painted aluminium material. For wet places cement board is used as ceiling covering.
DOOR
EXT.DOOR 90x200 cm Steel door with metal frame. For external doors a special cylindrical, first class, TSE certified locks are used.
INT.DOOR Interior doors: 80x200 sizes, galvanized steel frame, off-white wooden American door. Aluminum and PVC doors are also optional. TSE certified built-in locks are in use.
WINDOWS
WINDOW 120X100, 120x160 cm and 60x40 cm (transom window) of PVC-based materials and TSE certified and also 60 series. (Optionally frames made out of cement board can be applied around windows and transoms).
DOUBLE GLAZING All glass used for windows is 4 + 16 + 4 double glazed, and for transom frosted glass is used.
When order is placed all doors and windows dimensions must be mentioned.
STAIRS
Produced from galvanized steel profiles ,that are specially shaped by rollform machines. Stairs are assembled using seamless screw system. Steps are covered with wood and risers are open. Handrails are manufactured from decorative wrought iron. Metal parts are painted with electrostatic paint.Optionally the stairs can be produced completely from wood.
PAINTINGS
EXTERIOR PAINTING External metal parts are painted double layer coating and with double layer synthetic oil paint. External cement boards panels surfaces are painted with acrylic paint. For external wall mastic is applied on the jointing areas. TSE certified painting products are used in our buildings.
INTERIOR PAINTING The interior cement board surfaces and ceiling gypsum boards are painted with plastic paint. TSE certified painting products are used in our buildings.
OTHER The galvanized cold formed trusses, purlin and panel frames are not coated as they are produced by means of seamless technology.
ELECTRICAL INSTALATION
INSTALLATIONS Electric installation is applied over plaster using TSE certified cables.
CABLES Installation is applied over plaster and can be flush mounted optionally.
FUSES TSE certified fuses are used.
LIGHTING FIXTURES TSE certified materials are used.
SWITCH & SOCKET TSE certified switch and sockets are used.
OUTER CONNECTION Electric meter, ground rods and outdoor connections are responsability of the buyer.
SANITARY INSTALLATION
INSTALLATION Installation is applied over plaster and can be flush mounted optionally.
SANITARY WARE TSE certified materials are used.
TAP AND SHOWER EQUIPMENT TSE certified materials are used.
PIPES Clean water pipes are made of PPRC and waste water pipes are made of PVC and all materials are TSE certified.
OUTER CONNECTION Water meter and outer connections are responsability of the walking house buyer.
FOUNDATION AND CONCRETE

Concrete slab (foundation) should be done according to the concrete plan (basic dimensions) provided by as prefabricated. Concrete slab and soil survey are responsabilites of the customer.The building is fixed to the ground with anchors and steel dowels. Anchored raft or steel wire mesh foundation should be prepared. The customer is responsible for all excavation operations.




As prefabricated constructions start with reasonable prices and vary from plasterboards, european paper coverings to fireplaces. We have a lot of options related to roofing. According to our customers request, the roof of your prefabricated house can be made as deciduous, kiremetal, painted galvanized, polished or polished. The laying of special insulation materials between the roofs can be done by using glass fiber reinforced polyester (polystyrene foam), glass face (izocan) sandavic panel side stone wool materials. In our constructions, the sobal system can be heated very comfortably and comfortably by heating, natural gas and electric heaters. If desired, a fireplace can be made. Our customers make turn-key prefabricated structures including laminar parquet, tiles, kalebodur, natural gas installation, heating installation which are related works to the sub-floor and sub-floor. Our prices vary according to customer demand. We can turn a prefabricated building into a wooden-looking house. In our Kumburgaz showroom you can also see our different large-scale kumburgaz façade, which has been transformed into a villa-look by using the cover coating technology. Contact us to find out where we are closest to you. We are establishing in a short period of time with our new generation technology that we pride ourselves on projects such as house, office, construction site, dining hall, dormitory, school, factory, hospital, hangar, cafeteria. We can build turnkey prefabricated buildings if our customers wish. Our company, which is making our prefabricated houses in a very short time suitable for 4 seasons conditions and can survive as depression resistant, provides service with professional staff to all the factories and districts of Turkey, neighborhoods and villages in order to meet the needs of the house.


What are AS Prefabricated Steel House Advantages?
* Has a fast and economical construction process.
* The construction process is not affected by the climate conditions.
* Provides high energy efficiency with different and economical solutions for different climatic conditions.
* Depression is the most durable construction system in the world.
* Due to its light weight it can be constructed even in the worst ground conditions.
* It is a system applied to all countries that accept international standards.
* Unique advantages in energy efficiency and sustainability.
* Provides great ease and flexibility in architectural, electrical and mechanical solutions.
* Provides high building facility possibilities for users. (Factors such as heat, sound, humidity, sunshine)
* It lasts much longer.
* Designed without collar and without beam, provides interior and decoration comfort, offers spacious and spacious interior.
* It is the most suitable solution for the construction of places with healthy indoor air quality.
* Construction site does not affect the quality of the environment and social life.
* It saves environmentalist and minimum water consumption during construction and reduces the risk of pollution of water resources and groundwater.
* 90% and above are recyclable materials.

What are the characteristics of Prefabricated Houses?
Homogeneous, isotropic, durable and least human construction systems are among the least. It allows error-free and undamaged production. 365 days a year, allows for sustainable construction management in all weather conditions, short-term and dry manufacturing at the plant and site. System elements provide lifetime protection against corrosion by galvanizing method. Design offers a wide choice of materials, flexibility and aesthetics. Interior user without arm, without beam. Offers the opportunity to use the net space.


At the same time, compared to traditional systems, wall thicknesses are in certain standards. Therefore, they have the features such as saving in exterior wall coverage and providing 7-10% space saving in interior. It is much sharper than other construction systems. This has the advantage of having high earthquake performance.
Quick and easy installation means shortening construction time. Thus, it will allow to reduce the indirect costs that will befall the sahada. It provides the advantage of less worker and short time to finish the job. Temporary prefabricated, long life, high standard of comfort, permanent constructions.
The inner and outer appearance obtained when the house is finished is traditionally no different. While the system is under the control of experienced engineers and architects, manufacturing is carried out by factory and field educated workers.


Design and production are suitable for all national and international specifications. Electric and mechanical installations in an as prefabricated steel home system are considered during design. Prior to production, the holes in the wall dikings and floor beams to be installed by the installation are determined and opened during production. Crushing, pouring and repairing operations are not required as in conventional systems. This protects the contractor during construction from additional costs during use. The user offers high building physics possibilities. (Gypsum boards and cement-based coatings provide the required fire protection conditions) Thermal insulation is designed according to the climatic conditions of each zone and is applied with appropriate material selection.The heat insulation performance is also high in this area.

It is reported by the American Iron and Steel Association that the steel is 90% recyclable and is certified by the International Environmental Management Systems. According to the American Lung Association, thanks to the materials used, the building system is obtained from spaces with healthy indoor air quality. For each project, special static calculations are made, which determine the maximum openings and floor heights to which the result can be passed. There is no problem in supplying the materials used in the system on national and international conditions. The interest in the system, which has been widely used in America for 50 years and met with Turkey after the 1999 earthquake, has been increasing day by day in the Gulf countries, especially in the emirates like Dubai and Abu Dhabi which have recently started to build.



Prefabricated Houses How Many Establishments? Makes?
  
Prefabricated houses are fast and practical constructions. Already such a rapid construction of a large section of these homes is one of the reasons to prefer.
 
Generally, companies produce modular prefabricated house parts within 5-9 days and complete the assembly within one week.
 
But this is the case for a standard house based on stable conditions. Listed below are the situations that can affect this process. If you can get the most out of this list, the installation of your house will be completed very soon.
  
Factors Affecting Prefabricated House Installation Time
  
The prefabricated house will not be given a clear answer on the question of how many days it will be established. The reason for this is the following. Factors affecting the installation time of prefabricated houses are below.
 

  • Time to Obtain Legal and Required Documents (Permission to be obtained from municipalities and other official institutions can not start to build houses unless the subjects such as legal procedures are completed)
  • Completion Time of Evin Floor Concrete (Prefabricated house flooring is strengthened by flattening of the floor and the process of throwing the floor botton takes time, which also affects the prefabricated house construction period)
  • Place to be built (If the house is too far from the center, the master will change the construction period of the house since the construction will take time, such as the material foundation).
  • Master Quality (The master can finish the house more quickly because he is more experienced and his skills are also effective on how many days the house will be built)
  • Material Quality (Prefabricated household parts are modular parts, quality money will be assembled without trouble, so it can shorten the time)
  • Equipment to be used (If the equipment is fully used with the help of technology in the construction of the house, it will be done in a shorter time.It is important that the prefabricated house company has full capacity and all necessary installation equipments.
  • House size (the bigger the house is, the shorter the duration will be).
  • Number of floors (The number of storeys is also one of the factors directly affecting the duration, the more the floor is, the longer the duration of the prefabricated house installation)

 
 Prefabricated House Built in Number of Days
 
 The factors we consider above make the duration variable. But in general when the master and the material are ready and the required permits are taken, the times are considered when we think for a single storey standard house with a size of 80-90 square meters;
 

  • Basic Disposal: It takes 3-4 days to prepare the ground and lay the foundation. The drying process is also included in the process.
  • Production of Modular Parts: It may take 5-9 days to prepare the parts that will create your house. This issue is directly proportional to the company's capacity.
  • Creation of Evin Steel Frame: It is completed within 1-2 days in general.
  • Mounting the walls of houses: Usually the same day is completed
  • Prefabricated Tavan. Unite in 1-2 days.
  • Finishes: Finish in the same day.

Write a review

Note: HTML is not translated!
    Bad           Good

tiny house wood modern frame house plan

  • Brand: As Su Deposu
  • Product Code: TY664
  • Availability: In Stock
  • Condition: New

  • 2,594.83USD

  • Including Tax: 2,594.83USD

0 reviews / Write a review


google advertising